Curtis Jere Round Brass Wall Mirror for Artisan House

Price Sold
Dimensions
23in H x 23in W x 5in D
Materials
Polished Brass, Original Mirror

Pick up from store

5448 E. Olympic Blvd., Los Angeles, CA 90022

U.S. Shipping

$150

L.A. Shipping

Starting at $95

Simple & flexible returns

If it's not a perfect fit, send it back. Read our Return Policy.
Rated 5.0 out of 5 (550 Reviews )

Read excellent ratings about our products, customer service, quality, and shipping.

Curtis Jere Round Brass Wall Mirror for Artisan House

Inquiry

Ask about Curtis Jere Round Brass Wall Mirror for Artisan House

15+
Years of restoration craft
8,000
Pieces restored in-house
80+
Designers represented

Description

Product care

Glass care tip

Glass

{"type":"root","children":[{"type":"list","listType":"unordered","children":[{"type":"list-item","children":[{"type":"text","value":"Avoid placing objects that cause scratches to the surface"}]},{"type":"list-item","children":[{"type":"text","value":"Use a soft , damp cloth lint"}]},{"type":"list-item","children":[{"type":"text","value":"Use newspaper to drag dirt and leave no marks"}]},{"type":"list-item","children":[{"type":"text","value":"Dry glass using dry newspaper or a soft cloth"}]},{"type":"list-item","children":[{"type":"text","value":"Use liquid glass cleaner, following the manufacturer's instructions"}]}]}]}
Chrome and Brass care tip

Chrome and Brass

{"type":"root","children":[{"type":"list","listType":"unordered","children":[{"type":"list-item","children":[{"type":"text","value":"Avoid spilling grease on chromium or brass."}]},{"type":"list-item","children":[{"type":"text","value":"Clean the chrome or brass at the time it is stained."}]},{"type":"list-item","children":[{"type":"text","value":"Clean chrome or brass frequently with rust preventative lubricant."}]},{"type":"list-item","children":[{"type":"text","value":"Apply a special wax layer to add luster."}]},{"type":"list-item","children":[{"type":"text","value":"Use a damp and soft cloth, then use a dry and soft cloth."}]},{"type":"list-item","children":[{"type":"text","value":"To preserve the nature of the chrome or brass, use only cleaning products that are specific to this type of material."}]},{"type":"list-item","children":[{"type":"text","value":"When using chemicals for chromium or brass, follow the manufacturer's instructions."}]}]}]}
Curtis Jere

Designer spotlight

Curtis Jere

Renowned for his elegant and timeless teak seating and dining designs.

All Møller pieces
After
Before
Drag to reveal - 64 hours of bench work

The Restoration Record

Everything we touched, and everything we left alone

Sixty-four hours of bench time by two craftsmen in our Hyperion Avenue workshop. Period-correct methods and materials throughout.

Frame fully disassembled, joints cleaned of old glue and re-set with hide glue. One rear stretcher replaced with salvaged period teak, grain-matched.
Stripped by hand, sanded through 120/180/240/320 grit, then three coats of Danish oil cut back between coats. No lacquer, no filler, no stain.
New jute webbing over the original beech rails; horsehair and natural latex pad; Kvadrat wool bouclé in undyed oat.
Maker's stamp, original brass fittings and the patina on the arm caps, the marks that prove the piece lived.